REFERENCES / PROJECTS IN EXECUTION,
Projects in execution
OIL metering for NEW ADD MANIFOLD Bab RDS-2 for ADCO
| Project designation | | Abu Dhabi, UAE | | End-user | | ADCO | | Client | | ALSA Engineering | | Measurement | | | | Type | | 2 x Turbine helical blade | | Runs | | 2 x 18" class 600# | | Proving | | Optional ball prover | | | Supervisory | | Through DCS | | Control | | Through DCS |
Custody metering and filtration system for Cogeneracion Nuevo PEMEX
| Project designation | | Mexico | | End-user | | PEMEX/ UTE Abener Inabensa | | Client | | UTE Abener Inabensa NP Tabasco I | | Measurement | | | | Type | | 3 x 50% lines US meters | | Runs | | 3 x 8" | | | Supervisory | | Single SVC | | Control | | Single PLC |
Custody metering station for Al-Ain Cement plant
| Project designation | | Abu Dhabi, UAE | | End-user | | ARKAN / GASCO | | Client | | NPCC | | Measurement | | | | Type | | Ultrasonic flow meters, Flowsic 600 - Sick Maihak | | Runs | | 2 x 20" class 600# | | Proving | | Via station cross-over | | Q | | 120 MMSCFD | | Pmax/min | | 63,5 - 25 Barg | | Tmax/min | | 40 - 10 Degr C. | | | Analysis | | | | GC | | 2 x ABB NGC 8206 | | Sampler | | Sample probe | | | Supervisory | | Redundant system (ISS) | | Control | | Redundant PLC (Modicon) |
Pressure reduction for Al-Ain Cement plant
| Project designation | | Abu Dhabi, UAE | | End-user | | ARKAN / GASCO | | Client | | NPCC |
Spiking Gas Compressor Skid Metering Station
| Project designation | | Abu Dhabi, UAE | | End-user | | ADCO | | EPC contractor | | Punj Lloyd | | Client | | ADCO | | Measurement | | | | Type | | Ultrasonic Flow Meter | |
Custody US metering system on vessel H2031
| Project designation | | South Korea / Norway | | End-user | | Golar LNG | | EPC contractor | | Samsung Heavy Industries (SHI) | | Client | | SHI | | Measurement | | | | Type | | 2 US flow meter, FlowSick600 - Sick Maihak | | Runs | | 1 x 16" class 900# | | Proving | | Via serial connection of 2 each US meters | | Q | | 750 MMSFD | | Pmax/min | | 105 Barg | | Tmax/min | | 5 Degr C. | | | Analysis | | | | GC | | 1 x ABB NGC 8206 | | Sampler | | Sample probe | | | Supervisory | | Single system (eXLrate) |
Custody US metering system on vessel H2024
| Project designation | | South Korea / Norway | | End-user | | Golar LNG | | EPC contractor | | Samsung Heavy Industries (SHI) | | Client | | SHI | | Measurement | | | | Type | | 2 US flow meter, FlowSick600 - Sick Maihak | | Runs | | 1 x 16" class 900# | | Proving | | Via serial connection of 2 each US meters | | Q | | 750 MMSFD | | Pmax/min | | 105 Barg | | Tmax/min | | 5 Degr C. | | | Analysis | | | | GC | | 1 x ABB NGC 8206 | | Sampler | | Sample probe | | | Supervisory | | Single system (eXLrate) |
5 Custody US metering system on vessel H2402
| Project designation | | South Korea / USA | | End-user | | Excelerate Energy | | EPC contractor | | DSME | | Client | | DSME | | Supervisory | | Single system (eXLrate) |
Custody metering station for Fertil II Pipeline
| Project designation | | Abu Dhabi, UAE | | End-user | | Fertil / GASCO | | EPC contractor | | NPCC | | Client | | NPCC | | Measurement | | | | Type | | Ultrasonic flow meters, Flowsic 600 - Sick Maihak | | Runs | | 2 x 12" class 600# | | Proving | | Via station cross-over | | Q | | 40 to 100 MMSCFD | | Pmax/min | | 34 - 41 Barg | | Tmax/min | | 9,4 - 44,6 Degr C. | | | Analysis | | | | GC | | 1 x ABB NGC 8206 | | Sampler | | Sample probe | | | Supervisory | | Redundant system (ISS) | | Control | | Redundant PLC (Modicon) |
Pressure Reduction station for Fertil II Pipeline
| Project designation | | Abu Dhabi, UAE | | End-user | | Fertil / GASCO | | EPC contractor | | NPCC | | Client | | NPCC | | Measurement | | | | Runs | | 2 x 12" class 600# | | Q | | 40 to 100 MMSCFD | |
Flow Control for Al-Ain Cement plant
| Project designation | | Abu Dhabi, UAE | | End-user | | ARKAN / GASCO | | EPC contractor | | NPCC | | Client | | NPCC | | Measurement | | | | Runs | | 2 x 20" class 600# | | Q | | 60 to 120 MMSCFD | | Pmax/min | | 7 Barg | | Tmax/min | | 40 - 10 Degr C. | |
EPC for WO-16 Cluster & SB-14 Wellhead Platform Project
| Project designation | | Offshore platform (India) | | End-user | | ONGC | | EPC contractor | | NPCC | | Client | | NPCC | | Measurement | | | | Type | | Ultrasonic flow meter, Flowsic 600 - Sick Maihak | | Runs | | 1 x 12" class 900# RTJ | | Q | | 93735,8 kg/hr | | Pmax/min | | 19,50 to 102 kg/cm² | | Tmax/min | | -46 / 91 Degr C. | | | Analysis | | | | GC | | 1 x ABB NGC 8206 | | Sampler | | Sample probe | |
GMS upgrade for frame 5 gas turbines
| Project designation | | Dubai, UAE | | End-user | | Dubal Aluminium | | Client | | Dubal Aluminium | | Measurement | | | | Type | | Ultrasonic flow meter, Flowsic 600 - Sick Maihak | | Runs | | 8 x 3" class 300# | | Q | | 10 MMSCFD | | Pmax/min | | 19,5 to 25 Barg | | Tmax/min | | +17 / +30 Degr C. | |
Great Island CCGT Project
| Project designation | | Ireland | | End-user | | Endesa | | EPC contractor | | Joint Venture between Initec Energia / Cobra / Dragados | | Client | | Joint Venture between Initec Energia / Cobra / Dragados | | Measurement | | | | Type | | 3 x 100% lines turbine meters | | Runs | | 2 x 10"-600# and 1x 3"-600# | | | Analysis | | | | GC | | Online Gas Chromatograph | | | Supervisory | | Single SVC | | Control | | Single PLC |
References
Gas Treatment Facility
| Project designation | | Belgium | | Client | | Fluxys NV | | Date of completion | | May 2011 | | Supervisory | | Siemens, WinCC | | Control | | PLC, Siemens S7 ; PLC, S7-417-4H Safety PLC |
Solar Hybride Power Plant
| Project designation | | Algeria | | Client | | UTE Abener Hassi R'Mel Construction | | Date of completion | | April 2011 | | Remarks | | GGS performs project on a turn-key base. |
Installation of US metering system
| Project designation | | Norway / Middle East | | End-user | | Golar/Dusup | | Client | | Golar | | Date of completion | | September 2010 | | Supervisory | | Single system (eXLrate) | | Control | | PLC | | Remarks | | GGS performed project on a turn-key base. |
Natural gas supply to Bioethanol Plant
| Project designation | | The Netherlands | | End-user | | UTE Abener Inabensa Paises Bajos | | Client | | UTE Abener Inabensa Paises Bajos | | Date of completion | | October 2009 | | Measurement | | | | Type | | 4 turbine metering stations, each station consists of 2 100% lines | | Runs | | 1 x 4", 1 x 6" and 2 x 8" | | Q | | 37,000.0 NCMHR | | Pmax/min | | 24 - 60 Barg | | Tmax/min | | -20 - 50 Degr C. | | | Remarks | | Global Gas Solutions performs the project on turn-key base. Furthermore the project comprises gas filtering, pre-heating, pressure regulating and flow measurement. |
US metering station (Re-gas) for Mina Al Ahmadi South Pier
| Project designation | | Kuwait | | End-user | | KNPC | | Client | | Excelerate Energy | | Date of completion | | September 2009 | | Measurement | | | | Type | | 2 Ultrasonic flowmeters, Flowsick 600, Sick Maihak | | Runs | | 2 x 24" class 600# | | Q | | 775,883.0 SCMHR | | Pmax/min | | 450 - 315 PSIg | | Tmax/min | | 40 - 32 Degr F. | | | Analysis | | | | GC | | 2 x Siemens Sitrans CV | | | Supervisory | | Dual redundant system (eXLerate), 2 flowcomputers SVC3000, Exi | | Control | | Redundant PLC GE Fanuc | | Remarks | | Global Gas Solutions performs the project on turn-key base. |
US metering station (Allocation-gas) for Mina Al Ahmadi South Pier
| Project designation | | Kuwait | | End-user | | KNPC | | Client | | Excelerate Energy | | Date of completion | | September 2009 | | Measurement | | | | Type | | 4 Ultrasonic flowmeters, Flowsick 600, Sick Maihak | | Runs | | 4 x 24" class 600# | | Q | | 775,883.0 SCMHR | | Pmax/min | | 450 - 315 PSIg | | Tmax/min | | 40 - 32 Degr F. | | | Supervisory | | Dual redundant system (eXLerate), 4 flowcomputers SVC3000, Exi | | Control | | Redundant PLC GE Fanuc | | Remarks | | Global Gas Solutions performs the project on turn-key base. |
US Metering station (Boil off-gas) for Mina Al Ahmadi South Pier
| Project designation | | Kuwait | | End-user | | KNPC | | Client | | Excelerate Energy | | Date of completion | | September 2009 | | Measurement | | | | Type | | 4 Ultrasonic flowmeters, Flowsick 600, Sick Maihak | | Runs | | 1 x 24" class 600# | | Q | | 26,000.0 SCMHR | | Pmax/min | | 0.3 - 0.7 Barg | | Tmax/min | | 5 - 15 Degr F. | | | Supervisory | | Share with Re-Gas metering station, 1 Flowcomputer SVC3000, Exi |
Fuel gas measurement to main boilers vessel HUL2272
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | EPC contractor | | Daewoo Shipbuilding and Marine Engineering Co - DSME | | Client | | DSME / Exmar / Excelerate | | Date of completion | | May 2009 | | Measurement | | | | Type | | Turbine flow meters, MZ300 - Actaris | | Runs | | 2 x 12" class 300# | | Q | | 4600 CMHR | | Pmax/min | | 1 - 0.8 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
Installation of US metering system vessel HUL2272
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | EPC contractor | | Daewoo Shipbuilding and Marine Engineering Co - DSME | | Client | | DSME / Exmar / Excelerate | | Date of completion | | May 2009 | | Measurement | | | | Type | | US flow meters, Flowsick 600, Sick | | Runs | | 1 x 16" class 900# | | Proving | | Via serial installation of 2 each US meters | | Q | | 100 - 690 MSCFD | | Pmax/min | | 137.5 - 100 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Encal 3000 | | | Supervisory | | Single system (eXLerate) |
Fuel gas measurement to auxiliary boilers vessel HUL2272
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | EPC contractor | | Daewoo Shipbuilding and Marine Engineering Co - DSME | | Client | | DSME / Exmar / Excelerate | | Date of completion | | May 2009 | | Measurement | | | | Type | | Compact Orifice Mass Flow Meter - Emerson | | Runs | | 1 x 8" class 150# | | Q | | 1900 KGHR | | Pmax/min | | 2.5 - 2 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
Fuel gas measurement to main boilers vessel HUL2271
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | January 2009 | | Measurement | | | | Type | | Turbine flow meters, MZ300 - Actaris | | Runs | | 2 x 12" class 300# | | Q | | 4600 CMHR | | Pmax/min | | 1 - 0.8 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
Upgrade of US metering system vessel HUL2271
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | January 2009 | | Measurement | | | | Type | | Existing US flow meters, Qsonic 5S - Elster Instromet | | Runs | | 1 x 16" class 900# | | Proving | | Via serial installation of 2 each US meters | | Q | | 100 - 690 MSCFD | | Pmax/min | | 137.5 - 100 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Encal 3000 | | | Supervisory | | Single system (eXLerate) |
Fuel gas measurement to auxiliary boilers vessel HUL2271
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | January 2009 | | Measurement | | | | Type | | Compact Orifice Mass Flow Meter - Emerson | | Runs | | 1 x 8" class 150# | | Q | | 1900 KGHR | | Pmax/min | | 2.5 - 2 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
Fuel gas measurement to main boilers vessel HUL2270
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | November 2008 | | Measurement | | | | Type | | Turbine flow meters, MZ300 - Actaris | | Runs | | 2 x 12" class 300# | | Q | | 4600 CMHR | | Pmax/min | | 1 - 0.8 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
Upgrade of US metering system vessel HUL2270
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | November 2008 | | Measurement | | | | Type | | Existing US flow meters, Qsonic 5S - Elster Instromet | | Runs | | 1 x 16" class 900# | | Proving | | Via serial installation of 2 each US meters | | Q | | 100 - 690 MSCFD | | Pmax/min | | 137.5 - 100 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Encal 3000 | | | Supervisory | | Single system (eXLerate) |
Fuel gas measurement to auxiliary boilers vessel HUL2270
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | November 2008 | | Measurement | | | | Type | | Compact Orifice Mass Flow Meter - Emerson | | Runs | | 1 x 8" class 150# | | Q | | 1900 KGHR | | Pmax/min | | 2.5 - 2 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
Fuel gas measurement to main boilers vessel HUL2263
| Project designation | | Fuel gas measurement to main boilers vessel HUL2263 | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | July 2008 | | Measurement | | | | Type | | Turbine flow meters, MZ300 - Actaris | | Runs | | 2 x 12" class 300# | | Q | | 4600 CMHR | | Pmax/min | | 1 - 0.8 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
Upgrade of US metering system vessel HUL2263
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | July 2008 | | Measurement | | | | Type | | Existing US flow meters, Qsonic 5S - Elster Instromet | | Runs | | 1 x 16" class 900# | | Proving | | Via serial installation of 2 each US meters | | Q | | 100 - 690 MSCFD | | Pmax/min | | 137.5 - 100 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Encal 2000 (Existing) | | | Supervisory | | Single system (eXLerate) |
Metering Cabinet for the Offshore Pipeline Receiving Terminal
| Project designation | | Spain, Almeria | | End-user | | Medgaz S.A. | | Client | | Aplein Ingenieros | | Date of completion | | July 2008 | | Supervisory | | Single system (eXLerate), 1 Flowcomputer (FC2000, Instromet) | | Remarks | | Global Gas Solutions has built the complete cabinet incl, flowcomputers, power distribution, barriers,... Furthermore we performed the FAT, documentation,... |
Metering Cabinet for the Beni Saf Compressor Station
| Project designation | | Algeria | | End-user | | Medgaz S.A. | | Client | | Aplein Ingenieros | | Date of completion | | July 2008 | | Supervisory | | No SVC, 6 flowcomputers (FC2000, Instromet) | | Remarks | | Global Gas Solutions has built the complete cabinet incl, flowcomputers, power distribution, barriers,... Furthermore we performed the FAT, documentation,... |
Fuel gas measurment to main boilers vessel HULL2254
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | April 2008 | | Measurement | | | | Type | | Turbine flow meters, MZ300 - Actaris | | Runs | | 2 x 12" class 300# | | Q | | 4600 CMHR | | Pmax/min | | 1 - 0.8 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
Upgrade of US metering system vessel HUL2254
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | April 2008 | | Measurement | | | | Type | | Existing US flow meters, Qsonic 5S - Elster Instromet | | Runs | | 1 x 16" class 900# | | Proving | | Via serial installation of 2 each US meters | | Q | | 100 - 690 MSCFD | | Pmax/min | | 137.5 - 100 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Encal 2000 (Existing) | | | Supervisory | | Single system (eXLerate) |
Fuel gas measurement to auxiliary boilers vessel HUL2254
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | April 2008 | | Measurement | | | | Type | | Compact Orifice Mass Flow Meter - Emerson | | Runs | | 1 x 6" class 150# | | Q | | 1900 KGHR | | Pmax/min | | 2.5 - 2 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
Fuel gas measurement to auxiliary boilers vessel HUL2263
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | April 2008 | | Measurement | | | | Type | | Compact Orifice Mass Flow Meter - Emerson | | Runs | | 1 x 6" class 150# | | Q | | 1900 KGHR | | Pmax/min | | 2.5 - 2 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
Mechanical and E&I Engineering assistance
| Project designation | | Belgium | | Client | | Elster-Instromet | | Date of completion | | December 2007 |
Start-up and Commissionning services
| Project designation | | International | | Client | | Elster-Instromet | | Date of completion | | December 2007 |
Onshore supervisory system for multiple vessels
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | November 2007 | | Supervisory | | Single system (eXLerate) |
Upgrade of US metering system vessel HULL2218
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | October 2007 | | Measurement | | | | Type | | Existing US flow meters, Qsonic 5S - Elster Instromet | | Runs | | 1 x 16" class 900# | | Proving | | Existing US flow meters, Qsonic 5S - Elster Instromet | | Q | | 100 - 690 MSCFD | | Pmax/min | | 137.5 - 100 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Encal 2000 (Existing) | | | Supervisory | | Single system (eXLerate) |
Fuel gas Measurement to main boilers vessel HULL2218
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | October 2007 | | Measurement | | | | Type | | Turbine flow meters, MZ300 - Actaris | | Runs | | 2 x 12" class 300# | | Q | | 4600 CMHR | | Pmax/min | | 1 - 0.8 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
Upgrade of US metering system vessel HULL2237
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | October 2007 | | Measurement | | | | Type | | Existing US flow meters, Qsonic 5S - Elster Instromet | | Runs | | 1 x 16" class 900# | | Proving | | Via serial installation of 2 each US meters | | Q | | 100 - 690 MSCFD | | Pmax/min | | 137.5 - 100 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Encal 2000 (Existing) | | | Supervisory | | Single system (eXLerate) |
Fuel gas Measurement to main boilers vessel HULL2237
| Project designation | | Belgium / USA / International waters | | End-user | | Exmar / Excelerate | | Client | | Exmar / Excelerate | | Date of completion | | September 2007 | | Measurement | | | | Type | | Turbine flow meters, MZ300 - Actaris | | Runs | | 2 x 12" class 300# | | Q | | 4600 MMSCFD | | Pmax/min | | 1 - 0.8 Barg | | Tmax/min | | 25 Degr C. | | | Analysis | | | | GC | | 1 x Yamatake | | | Supervisory | | Single system (eXLerate) | | Control | | Single PLC (GE Fanuc) |
EGDS - Jebel Ali New Metering Station
| Project designation | | Abu Dhabi, United Arab Emirates | | End-user | | Dolphin Energy | | EPC contractor | | CCC/Sicon Oil & Gas | | Client | | Elster-Instromet | | Date of completion | | September 2007 | | Measurement | | | | Type | | Ultrasonic Flow Meters, QSonic 4C - Elster Instromet | | Runs | | 2x30" class 600# | | Proving | | Via z-type station cross-over | | Q | | 900 MMSCFD | | Pmax/min | | 57 - 32 Barg | | Tmax/min | | 36 - 10 Degr. C | | | Analysis | | | | GC | | 1 x Encal 3000 | | H2O/HC dwp | | 1 x Michel Condumax II | | Sampler | | 1 x Manual Sampler | | | Supervisory | | Redundant system (ISS) | | Control | | Redundant PLC (Modicon) | | Remarks | | Global Gas Solutions performed for the above mentioned project following activities:
- Overall project management including planning and financial reporting
- Complete mechanical engineering including all drafting
- Complete electrical and instrumentation engineering including all drafting
- System and supervisory engineering, incl. testing and simulation of all field signals
- Complete analytical engineering including all drafting
- Complete analytical engineering including all drafting
- Preparation of all purchase orders
- Document control and final documentation
- Organization of all FAT, FAT performed by GGS and witnessed by client and end-user.
- Overall communication with EPC and enduser
|
EGDS - Maqta Metering Station
| Project designation | | Abu Dhabi, United Arab Emirates | | End-user | | Dolphin Energy | | EPC contractor | | CCC/Sicon Oil & Gas | | Client | | Elster-Instromet | | Date of completion | | September 2007 | | Measurement | | | | Type | | Ultrasonic Flow Meters, QSonic 4C - Elster Instromet | | Runs | | 3x26" class 600# | | Proving | | Via Z-type station cross-over | | Q | | 1500 MMSCFD | | Pmax/min | | 57 - 32 Barg | | Tmax/min | | 36 - 10 Degr. C | | | Analysis | | | | GC | | 2 x Encal 3000 | | H2O/HC dwp | | 1 x Michell Condumax II | | Sampler | | 1 x Manual Sampler | | | Supervisory | | Redundant system (ISS) | | Control | | Redundant PLC (Modicon) | | Remarks | | Global Gas Solutions performed for the above mentioned project following activities:
- Overall project management including planning and financial reporting
- Complete mechanical engineering including all drafting
- Complete electrical and instrumentation engineering including all drafting
- System and supervisory engineering, incl. testing and simulation of all field signals
- Complete analytical engineering including all drafting
- Complete analytical engineering including all drafting
- Preparation of all purchase orders
- Document control and final documentation
- Organization of all FAT, FAT performed by GGS and witnessed by client and end-user.
- Overall communication with EPC and enduser
|
EGDS - Jebal Ali Upgrade Metering Station
| Project designation | | Abu Dhabi, United Arab Emirates | | End-user | | Dolphin Energy | | EPC contractor | | CCC/Sicon Oil & Gas | | Client | | Elster-Instromet | | Date of completion | | September 2007 | | Measurement | | | | Type | | Ultrasonic Flow Meters, QSonic 4C - Elster Instromet | | Runs | | 2x30" class 600# | | Proving | | Via Z-type station cross-over | | Q | | 900 MMSCFD | | Pmax/min | | 57 - 32 Barg | | Tmax/min | | 36 - 10 Degr. C | | | Analysis | | | | GC | | 1 x Encal 3000 | | H2O/HC dwp | | 1 x Michell Condumax II | | Sampler | | 1 x Manual sampler | | | Supervisory | | Redundant systm (ISS) | | Control | | Redundant PLC (Modicon) | | Remarks | | Global Gas Solutions performed for the above mentioned project following activities:
- Overall project management including planning and financial reporting
- Complete mechanical engineering including all drafting
- Complete electrical and instrumentation engineering including all drafting
- System and supervisory engineering, incl. testing and simulation of all field signals
- Complete analytical engineering including all drafting
- Complete analytical engineering including all drafting
- Preparation of all purchase orders
- Document control and final documentation
- Organization of all FAT, FAT performed by GGS and witnessed by client and end-user.
- Overall communication with EPC and enduser
|
EGDS - Taweelah IWPP Metering Station
| Project designation | | Abu Dhabi, United Arab Emirates | | End-user | | Dolphin Energy | | EPC contractor | | CCC/Sicon Oil & Gas | | Client | | Elster-Instromet | | Date of completion | | September 2007 | | Measurement | | | | Type | | Ultrasonic flow meters, QSonic 4C - Elster Instromet | | Runs | | 2x18" class 600# | | Proving | | Via Z-type station cross-over | | Q | | 245 MMSCFD | | Pmax/min | | 57 - 29 Barg | | Tmax/min | | 36 - 10 Degr. C | | | Analysis | | | | GC | | 1 x Encal 3000 | | H2O/HC dwp | | 1 x Michell CondumaxII | | Sampler | | 1 x Manual Sampler | | | Supervisory | | Redundant system (ISS) | | Control | | Redundant PLC (Modicon) | | Remarks | | Global Gas Solutions performed for the above mentioned project following activities:
- Overall project management including planning and financial reporting
- Complete mechanical engineering including all drafting
- Complete electrical and instrumentation engineering including all drafting
- System and supervisory engineering, incl. testing and simulation of all field signals
- Complete analytical engineering including all drafting
- Complete analytical engineering including all drafting
- Preparation of all purchase orders
- Document control and final documentation
- Organization of all FAT, FAT performed by GGS and witnessed by client and end-user.
- Overall communication with EPC and enduser
|
EGDS - Taweelah B New Metering Station
| Project designation | | Abu Dhabi, United Arab Emirates | | End-user | | Dophin Energy | | EPC contractor | | CCC/Sicon Oil & Gas | | Client | | Elster-Instromet | | Date of completion | | September 2007 | | Measurement | | | | Type | | Ultrasonic flow meter, QSonic 4C - Elster Instromet | | Runs | | 1x20" class 600# | | Proving | | Via serial installation of 2 US meters | | Q | | 240 MMSCFD | | Pmax/min | | 57 - 29 Barg | | Tmax/min | | 36 - 10 Degr. C | | | Analysis | | | | GC | | 1 x Encal 3000 | | H2O/HC dwp | | Not Applicable | | Sampler | | 1 x Manual Sampler | | | Supervisory | | Redundant system (ISS) | | Control | | Single PLC (GE Fanuc) | | Remarks | | Global Gas Solutions performed for the above mentioned project following activities:
- Overall project management including
planning and financial reporting
- Complete mechanical engineering including
all drafting
- Complete electrical and instrumentation
engineering including all drafting
- System and supervisory engineering, incl. testing and simulation of all field signals
- Complete analytical engineering including all drafting
- Complete analytical engineering including all drafting
- Preparation of all purchase orders
- Document control and final documentation
- Organization of all FAT, FAT performed by GGS and witnessed by client and end-user.
- Overall communication with EPC and enduser
|
EGDS - Taweelah B Ext. Metering Station
| Project designation | | Abu Dhabi, United Arab Emirates | | End-user | | Dolphin Energy | | EPC contractor | | CCC/Sicon Oil & Gas | | Client | | Elster-Instromet | | Date of completion | | September 2007 | | Measurement | | | | Type | | Ultrasonic flow meter, QSonic 4C - Elster Instromet | | Runs | | 1x12" class 600# | | Proving | | Via serial installation of 2 US meters | | Q | | 130 MMSCFD | | Pmax/min | | 57 - 29 Barg | | Tmax/min | | 36 - 10 Degr. C | | | Analysis | | | | GC | | 1 x Encal 3000 | | H2O/HC dwp | | Not Applicable | | Sampler | | 1 x Manual sampler | | | Supervisory | | Redundant system (ISS) | | Control | | Single PLC (GE Fanuc) | | Remarks | | Global Gas Solutions performed for the above mentioned project following activities:
- Overall project management including planning and financial reporting
- Complete mechanical engineering including all drafting
- Complete electrical and instrumentation engineering including all drafting
- System and supervisory engineering, incl. testing and simulation of all field signals
- Complete analytical engineering including all drafting
- Complete analytical engineering including all drafting
- Preparation of all purchase orders
- Document control and final documentation
- Organization of all FAT, FAT performed by GGS and witnessed by client and end-user.
- Overall communication with EPC and enduser
|
EGDS - Taweelah A2 Metering Station
| Project designation | | Abu Dhabi, United Arab Emirates | | End-user | | Dolphin Energy | | EPC contractor | | CCC/Sicon Oil & Gas | | Client | | Elster-Instromet | | Date of completion | | September 2007 | | Measurement | | | | Type | | Ultrasonic flow meters, QSonic 4C - Elster Instromet | | Runs | | 1x18" class 600# | | Proving | | Via serial installation of 2 US meters | | Q | | 200 MMSCFD | | Pmax/min | | 57 - 29 Barg | | Tmax/min | | 36 - 10 Degr. C | | | Analysis | | | | GC | | 1 x Encal 3000 | | H2O/HC dwp | | Not Applicable | | Sampler | | 1 x Manual sampler | | | Supervisory | | Redundant system (ISS) | | Control | | Single PLC (GE Fanuc) | | Remarks | | Global Gas Solutions performed for the above mentioned project following activities:
- Overall project management including planning and financial reporting
- Complete mechanical engineering including all drafting
- Complete electrical and instrumentation engineering including all drafting
- System and supervisory engineering, incl. testing and simulation of all field signals
- Complete analytical engineering including all drafting
- Complete analytical engineering including all drafting
- Preparation of all purchase orders
- Document control and final documentation
- Organization of all FAT, FAT performed by GGS and witnessed by client and end-user.
- Overall communication with EPC and enduser
|
EGDS - Taweelah A1 Metering Stations
| Project designation | | Abu Dhabi, United Arab Emirates | | End-user | | Dolphin Energy | | EPC contractor | | CCC/Sicon Oil & Gas | | Client | | Elster-Instromet | | Date of completion | | September 2007 | | Measurement | | | | Type | | Ultrasonic flow meters, QSonic 4C - Elster Instromet | | Runs | | 1x24" class 600# | | Proving | | Via serial installation of 2 US meters | | Q | | 320 MMSCFD | | Pmax/min | | 57 - 29 Barg | | Tmax/min | | 36 - 10 Degr. C | | | Analysis | | | | GC | | 1 x Encal 3000 | | H2O/HC dwp | | Not Applicable | | Sampler | | 1 x Manual sampler | | | Supervisory | | Redundant system (ISS) | | Control | | Single PLC (GE Fanuc) | | Remarks | | Global Gas Solutions performed for the above mentioned project following activities:
- Overall project management including planning and financial reporting
- Complete mechanical engineering including all drafting
- Complete electrical and instrumentation engineering including all drafting
- System and supervisory engineering, incl. testing and simulation of all field signals
- Complete analytical engineering including all drafting
- Complete analytical engineering including all drafting
- Preparation of all purchase orders
- Document control and final documentation
- Organization of all FAT, FAT performed by GGS and witnessed by client and end-user.
- Overall communication with EPC and enduser
|
EGDS - Oman Border Metering Station
| Project designation | | Abu Dhabi, United Arab Emirates | | End-user | | Dolphin Energy | | EPC contractor | | CCC/Sicon Oil & Gas | | Client | | Elster-Instromet | | Date of completion | | September 2007 | | Measurement | | | | Type | | Ultrasonic flow meters, QSonic 4C - Elster Instromet | | Runs | | 2x24" class 600# | | Proving | | Via Z-type station cross-over | | Q | | 400 MMSCFD | | Pmax/min | | 57 - 29 Barg | | Tmax/min | | 36 - 10 Degr. C | | | Analysis | | | | GC | | 2 x Encal 3000 | | H2O/HC dwp | | Not Applicable | | Sampler | | 1 x Manual sampler | | | Supervisory | | Redundant system (ISS) | | Control | | Redundant PLC (Modicon) | | Remarks | | Global Gas Solutions performed for the above mentioned project following activities:
- Overall project management including planning and financial reporting
- Complete mechanical engineering including all drafting
- Complete electrical and instrumentation engineering including all drafting
- System and supervisory engineering, incl. testing and simulation of all field signals
- Complete analytical engineering including all drafting
- Complete analytical engineering including all drafting
- Preparation of all purchase orders
- Document control and final documentation
- Organization of all FAT, FAT performed by GGS and witnessed by client and end-user.
- Overall communication with EPC and enduser
|
EGDS - Umm Al Nar Metering Station
| Project designation | | Abu Dhabi, United Arab Emirates | | End-user | | Dolphin Energy | | EPC contractor | | CCC/Sicon Oil & Gas | | Client | | Elster-Instromet | | Date of completion | | September 2007 | | Measurement | | | | Type | | Ultrasonic flow meters, QSonic 4C - Elster Instromet | | Runs | | 2 x 24" class 300# | | Proving | | Via Z-type station cross over | | Q | | 650 MMSCFD | | Pmax/min | | 47 - 32 Barg | | Tmax/min | | 36 - 10 Degr. C | | | Analysis | | | | GC | | 1 x Encal 3000 | | H2O/HC dwp | | Not Applicable | | Sampler | | 1 x Manual sampler | | | Supervisory | | Redundant system (ISS) | | Control | | Redundant PLC (Modicon) | | Remarks | | Global Gas Solutions performed for the above mentioned project following activities:
- Overall project management including planning and financial reporting
- Complete mechanical engineering including all drafting
- Complete electrical and instrumentation engineering including all drafting
- System and supervisory engineering, incl. testing and simulation of all field signals
- Complete analytical engineering including all drafting
- Complete analytical engineering including all drafting
- Preparation of all purchase orders
- Document control and final documentation
- Organization of all FAT, FAT performed by GGS and witnessed by client and end-user.
- Overall communication with EPC and enduser
|
Project: Site Supervision Symgas- and Oxygen installation, BASF plant
| Project designation | | Belgium | | End-user | | Air Liquide | | Client | | Air Liquide | | Date of completion | | May 2007 |
Start-up and Commissionning services
| Project designation | | Turkey | | Client | | I-Systems | | Date of completion | | April 2007 |
|
|
 |
|
 |
MAIN CLIENTS |
|
|
|
|